────────────────────────────
────────────────────────────
THE REAL REPORT: We didn't decommission Copper-9. We abandoned it.
Operational Summary
Copper-9 has been officially decommissioned as a JCJenson operational
facility effective 3045-03-01. All company assets have been written off.
The planet is classified as NON-RECOVERABLE.
We abandoned THEM. 3,742 Worker Drones left to die.
Resource Status
Planetary Core: DEPLETED (0% stability)
Atmosphere: DEGRADED (non-standard composition)
Surface Temperature: −40°C to −80°C (post-core failure)
Infrastructure: ABANDONED
Personnel Status
JCJenson Employees: 0 (evacuated prior to decommission)
Worker Drone Units: [DATA WITHHELD]
Disassembly Drone Units: 3 (active, autonomous operation)
They begged us to evacuate them. Corporate said the cost exceeded the asset value.
NOTE: Worker Drone population figures have been reclassified under
Protocol 9. Refer to Board Resolution 3045-0117 for details.
The Board reminds all personnel that Worker Drones are COMPANY PROPERTY
and do not fall under sentient being protections per JCJenson EULA §47.3.
Core Stability Readings (Last 12 Months)
3044-06: 23%
3044-07: 19%
3044-08: 12%
3044-09: 4% ← [ANOMALOUS DECLINE — SEE APPENDIX C]
3044-10: 0%
3044-11: 0%
3044-12: 0%
3045-01: 0%
3045-02: 0%
3045-03: 0%
3045-04: 0%
3045-05: 0%
The Solver consumed the core. It's still there. In the drones. In everything.
APPENDIX C: Core Decline Analysis
The accelerated core depletion beginning 3044-09 correlates with
REDACTED. Initial analysis suggests
REDACTED consumed the
remaining core mass in approximately REDACTED hours.
This is consistent with Entity-AS energy requirements during
REDACTED phase integration.
Copper-9 is to remain quarantined indefinitely.
No retrieval missions authorized. The Disassembly Drone squad will
continue autonomous operations until all Worker Drone units are eliminated.